Skip to content

Less desk.
More site.

Record every test and snag where it happens. Deneton does the paperwork.

Easy to set up

Import your Excel.
Start inspecting.

Your asset list becomes the project: every asset, every stage, every inspection to do. No retyping.

AssetsStagesInspections
Easy to use

Open the item. Answer the checklist. Add the photo.

All on your phone, standing next to the equipment. Pass or fail, with photos and remarks.

0 of 48 inspected on this walk

Everything recorded

What you enter on site is the record.

No notebook, no typing it up at the desk later. Every result, photo and snag is stored against its asset.

Proof

Once it's signed, it can't be changed.

Contractor, commissioning agent and client sign. A correction is a new record, and the original stays on file.

CRAC-02 · Functional testDraft
  • Unit starts on demand Pass
  • Fans run in sequence Pass
  • Supply air 18 to 20 °C 18.6 °C
  • Filters fitted and clean Fail
Snag raised Filter frame bent · 1 photo · assigned to the contractor
Contractor
Commissioning agent
Client
Control

One place for the whole project.

Everyone sees the same live status: inspected, complete, failed, still open.

Less desk. More site.

Set upOn siteRecordProofControl

3D worker model: “Construction Worker in High-Visibility Vest” by restore50 (Sketchfab), licensed CC BY 4.0, simplified for the web.

The inspection happened. Where is the record?

  • A register in one systemstatus
  • Checklists in anotherevidence
  • Photos in a chat groupproof
  • The real picture in a spreadsheetprogress
  • One record in Deneton.

    The asset, its stages, the checklist, the photos, the signatures and the snags live together. Nobody rebuilds the status on a Friday night.

How an asset moves

One asset.
Five stages.
One record.

An example from equipment. Each project names its own stages, for QA/QC, commissioning or handover.

Rows of electrical switchgear in a factory hallTower cranes over a building under constructionSite engineers checking a wall on a construction siteProcess pipework and pumps in a plant roomA long corridor in a data hall
01Witnessed at the manufacturer
The platform

The whole project, live.

Every witness updates the record the moment it is published. What you see is where the project stands now.

The Inspections table

See every feature

On site

The phone is the clipboard.

Open the item, answer the checklist, take the photos and publish. Each party then signs its slot, before anyone leaves the room.

  • Large answer buttons, one question at a time
  • Answers save as you go and wait on the device when the signal drops
  • Raise a snag from any answer, with the photo attached

Deneton on mobile

Three people in hard hats and high-visibility vests checking a wall on site
  • 50,000+assets in one projectTested at that scale, and it opens like a small one.
  • 3parties on one recordContractor, commissioning agent and client each sign their slot.
  • 0edits after sign-offA correction is a new record. The original stays on file.
  • 1place to lookStatus, evidence, signatures and snags, from invitation to PDF.
Integrity

Signed means locked.

An inspection record is evidence. The rules that protect it are enforced by the database itself, not only by the screen.

Security at Deneton

  • Locked once signedCorrections are new records. The original stays on file.
  • Permanent signaturesOnce signed or refused, a slot can't be changed by anyone.
  • Walled-off projectsEach company's data is separated on every query.
  • Full historyWho changed what, and when, on every item and snag.
Questions

Good to know.

What is Deneton?

An inspection management platform for every stage of construction: QA/QC, commissioning and handover. It tracks each asset through the stages your project defines and keeps the checklists, photos, signatures and snags of every inspection in one record.

What happens when the signal drops?

An open draft keeps working. Answers save as they are given. When the connection drops they are kept on the device until it comes back, and Publish waits until everything is saved.

Can people from other companies take part?

Yes. Contractors, vendors and clients join a project as guests with the account they already have. Their role can limit them to their own company's work.

How large a project can it handle?

Tables page on the server and imports run in chunks, so a project with tens of thousands of items loads and opens the same way a small one does.

Can a signed record be changed?

No. From the first signature on, a record can't be edited, turned back into a draft or deleted. A correction is a new record that replaces it, and the original stays on file. Signatures can never be changed or removed. Before anyone signs, the person who published it has 30 minutes to turn it back into a draft, and that step is logged.

Is it only for commissioning, or only for data centres?

No. Stages, outcomes and checklists are yours to define, so QA/QC inspections, commissioning tests and handover checks run on the same model. Data centre commissioning was the starting point and is one example.

Less desk.
More site.